REMOVE ADS
  • ABOUT US
  • AD-FREE MEMBERSHIP
  • BLEED KITS PROJECT
  • FUNDRAISERS
  • CONTACT US
LOGIN
ACCOUNT
Wiltshire 999s
  • WILTSHIRE NEWS
    • ALL NEWS
    • INCIDENTS
    • COURTS
    • COMMUNITY
  • WEST COUNTRY NEWS
  • NEWS NEAR YOU
    • SWINDON
    • CHIPPENHAM
    • TROWBRIDGE
    • SALISBURY
    • FIND YOUR AREA >
  • SUPPORT
    • MENTAL HEALTH
    • DOMESTIC ABUSE
No Result
View All Result
Wiltshire 999s
No Result
View All Result
Home Wiltshire news

Swindon road to close for TWO YEARS for ‘biggest regeneration scheme ever seen’

byDaniel Jae Webb
31 August 2022 • 12.23pm
Swindon road to close for TWO YEARS for ‘biggest regeneration scheme ever seen’
FacebookWhatsAppXBlueskyLinkedIn

A major Swindon road will close for ‘one of the biggest regeneration schemes ever seen’ locally.

Wiltshire 999s Ad-Free

Fleming Way will be shut to traffic from Sunday (4 September), to pave the way for a major redevelopment, which will act as a catalyst for further investment in the area.

Over the next three years, Swindon Borough Council is leading a £100m programme of investment in town centre projects to upgrade transport links, the public realm and heritage assets as well as bringing to life the 20-acre regeneration site next to Zurich’s new offices.

A key project will see the major upgrade and transformation of Fleming Way as the main gateway into the town centre creating a safer, easier to understand route into the town centre from the train station.

The Fleming Way subway will also be removed to make the road the same level as the town centre shopping area and The Parade. This will take place towards the end of the project to maintain easy pedestrian access into the town centre for as long as possible.

NEXT UP

Boy dies after air ambulance tasked to serious incident in Swindon

Police step up traffic enforcement patrols across Swindon

The project is due to be completed in the autumn of 2024.

Temporary bus stops and new bus diversions have been put in at the request of Swindon’s Bus Company who will be operating an alternative timetable during the works.

The current bus station next to the Tri-Centre will remain open while the Fleming Way improvements are carried out meaning Stagecoach and national bus service users will not be impacted during construction.

When the scheme is completed and the new bus interchange is operational, plans are in place to demolish the bus station with the site earmarked for the new Cultural Quarter.

Work has already begun on Fleming Way ahead of the full closure. Earlier this year Cheltenham Street car park was demolished to make way for a national bus hub and Whalebridge Junction was reconfigured to allow traffic approaching from Manchester Road to continue straight ahead into Princes Street, as well as turning left.

This project, and others in the town centre, will help to stimulate further investment in the area by increasing land values and making it more attractive for investors to bring forward new homes, offices, shops and leisure facilities.

Councillor Gary Sumner, Swindon Borough Council’s Cabinet Member for Strategic Infrastructure, Transport and Planning, said: “This is one of the biggest road improvement schemes in Swindon and the benefits it will bring are important to regenerate the town centre.

“It’s important we do what we can to improve the town centre but we can only do this by making improvements to the land we do own. This includes public realm improvements and enhancements to the roads – including Fleming Way.

“This project will increase the surrounding land values, unlock the Kimmerfields regeneration site next door to Zurich’s new offices and help entice new businesses into the area.

“I’m excited to see the changes over the next two years and hope the public will be able to see its benefits too.”Ben Power, Project Manager at Colas, added: “We’re delighted to be supporting the Fleming Way project on behalf of Swindon Borough Council. The transformation will unlock economic and social growth in the town centre, benefitting both businesses and the public.

“We look forward to delivering the project, working in collaboration with the Council to deliver a greener, more accessible town centre.”


Click here to join our WhatsApp Channel and get breaking news sent directly to your mobile – don’t forget to turn on notifications by clicking the bell icon.

Click a topic to read more stories like this:

Tags: SwindonSwindon Borough Council

READ MORE

Boy dies after air ambulance tasked to serious incident in Swindon

21 November 2026 • 1.01pm
Police step up traffic enforcement patrols across Swindon

Police step up traffic enforcement patrols across Swindon

21 November 2026 • 11.05am
Vehicle damaged after hitting fencing debris on road near Swindon

Vehicle damaged after hitting fencing debris on road near Swindon

21 November 2026 • 9.03am
Man dies in Trowbridge as 999 crews attend early hours incident

Three masked men with ‘weapon’ break into Swindon property

20 November 2026 • 11.02am
Brave Swindon rape survivor speaks out after men found guilty

Brave Swindon rape survivor speaks out after men found guilty

19 November 2026 • 6.17pm
Four men guilty of sexually abusing drugged woman in Swindon

Four men guilty of sexually abusing drugged woman in Swindon

19 November 2026 • 3.41pm
Load More

TOP STORIES

Firefighters called to unattended skip blaze in Bradford on Avon
Wiltshire news

Firefighters called to unattended skip blaze in Bradford on Avon

21 November 2026 • 10.40am

...

Read moreDetails
Wilton road to remain closed ‘for days’ after building wall collapses

Wilton road to remain closed ‘for days’ after building wall collapses

23 October 2026 • 5.44pm
Swindon property ‘linked to gang rape’ targeted with spray paint

Swindon property ‘linked to gang rape’ targeted with spray paint

23 October 2026 • 7.11pm
Wiltshire Police bids farewell to sergeant after 43-year career

Wiltshire Police bids farewell to sergeant after 43-year career

3 November 2026 • 5.03pm
Fly-tipper takes dead wasp to interview to explain dumping waste

Fly-tipper takes dead wasp to interview to explain dumping waste

9 November 2026 • 3.41pm
  • ABOUT
  • COMPLAINTS
  • CONTACT
  • CONTRIBUTORS
  • PRIVACY POLICY
Reporting reality.

All content © State Six News Limited, unless otherwise stated. All rights reserved. Wiltshire 999s is a trading style of State Six News Limited. Company number: 16190242. Registered company address: Suite A, 82 James Carter Road, Mildenhall, Suffolk, IP28 7DE.

REMOVE ADS
LOGIN ACCOUNT
  • HOMEPAGE
  • WILTSHIRE NEWS
    • ALL NEWS
    • INCIDENTS
    • COURTS
  • WEST COUNTRY NEWS
  • SUPPORT
    • DOMESTIC ABUSE
    • MENTAL HEALTH
  • ABOUT & CONTACT
    • ABOUT US
    • FUNDRAISERS
    • CONTACT US
    • WHATSAPP CHANNEL
    • CONTRIBUTOR TERMS
    • COMPLAINTS
  • AD-FREE MEMBERSHIP
    • AD-FREE SIGN UP
    • AD-FREE LOGIN
    • EDIT AD-FREE ACCOUNT